Mobile View Proposal

CTC Adjustments — Mobile

Two frames at 375 × 760. Project review list (cards-per-cost-code) plus the bottom-sheet adjustment dialog. Status options: ○ Not yet reviewed · ● On track · ▲ Over · ▼ Under.

1 · Project review list
CTC Review

Webster HS Renovation

Original
$1.42M
CTC Adj
+$48K
Current
$1.47M
Pending
+$12K
3 of 11 reviewed · 8 left
Tap a code to adjust
5006 Environmental Action
⚠ Over · CTC needed
Est
$8,500
Act
$11,240
Pending
+$2,740
80L Misc Labor Plumbing
▲ Overrun (draft)
Est
$24,000
Act
$28,910
Pending
+$4,910
02 Demolition
● On track
Est
$45,000
Act
$42,180
Pending
15 HVAC Equipment
○ Not yet reviewed
Est
$184,000
Act
$176,420
Pending
23 Sheet Metal
▼ Underrun (draft)
Est
$62,000
Act
$54,300
Pending
−$5,200
22 Plumbing Fixtures
○ Not yet reviewed
Est
$96,500
Act
$94,210
Pending
26 Electrical Rough-in
○ Not yet reviewed
Est
$58,000
Act
$57,800
Pending

Cards replace the 9-column desktop table. Each card shows code | name (mono code, truncated name), the current status pill, and three compact numeric mini-rows (Est / Act / Pending). Tone-tinted background flags rows needing attention. Tap → opens Frame 2's adjust sheet. Sticky footer mirrors desktop's reviewed-count + Finalize gate.

2 · Adjust dialog
CTC Review

Webster HS Renovation

Original
$1.42M
CTC Adj
+$48K
Current
$1.47M
Pending
+$12K
5006Environmental Action
80LMisc Labor Plumbing
Adjust cost code

5006 Environmental Action

Estimate $8,500 · Spent $11,240
Pull from
Split into multiple sources
Remaining to allocate $0.00
Sources must total the overrun amount before you can save. Green = balanced.

Bottom sheet matches the desktop entry dialog but stacks vertically. Three big status chips replace the radio row; the active chip glows in its tone color. Source allocation defaults to a single row with a Split into multiple sources link to add more (matching the desktop "+ Split" button). The traffic-light remaining strip turns red when the sum doesn't balance, gating Save.