| Project | Jul '2623 wkdays | Aug21 | Sep22 | Oct22 | Nov21 | Dec23 |
|---|---|---|---|---|---|---|
| ▶25248 Collinsville 5th Grade | 31K 3 / 3.2 |
31K 3 / 3.5 |
22K 2 / 2.4 |
19K 2 / 2.1 |
13K 1 / 1.5 |
7K · / 0.7 |
| ▶26110 Bixby Police | 22.3K 2 / 2.3 |
22.3K 3 / 2.5 |
44.6K 4 / 4.8 |
44.6K 4 / 4.8 |
33.5K 3 / 3.8 |
18.6K 3 / 1.9 |
|
Edit crew plan — HVAC · All remaining work
$521,950 left · % derives from crew, tap a % to lock it
19 crew-months
100% · 0% left
Jun '2622 wd
—
·
Jul23 wd
11%$59K
/ 2.3 affordable
Aug21 wd
17%$89K
/ 2.5 affordable
Sep22 wd
23%$118K
/ 4.8 affordable
Oct22 wd
23%$118K
/ 4.8 affordable
Nov21 wd
17%$89K
/ 3.8 affordable
Dec23 wd
🔒 10%$52K
/ 1.9 affordable
Jan '2721 wd
—
·
Need cost-code detail? Switch to Detailed mode →
|
||||||
| ▶24372 Rudisill Library HVAC (detailed) | — · |
— · |
— · |
— · |
— · |
— · |
| HVAC Total | 53.3K 5 / 5.5 |
53.3K 6 / 6.1 |
66.6K 6 / 7.2 |
63.6K 6 / 6.9 |
46.5K 4 / 5.3 |
25.6K 3 / 2.7 |