Mobile View Proposal

WIP · Profit Remaining — Mobile

One frame at 375 x 760. Per-job card view: project name + GC on the left, a stacked Rev / Cost / Profit Rem mini-table on the right. Sorted by Profit Remaining desc; underwater jobs surface in red.

1 · Profit Remaining
Cashflow

Profit Remaining

Est Revenue
$8.4M
Act Cost
$6.1M
Profit Rem
+$2.3M
Active 7 jobs sorted by profit rem
Webster HS Renovation
Flintco · GC
Rev Est $1.8M Cost Act $1.2M Profit Rem $420K
Tulsa Zoo Penguins
Manhattan Construction
Rev Est $1.4M Cost Act $960K Profit Rem $310K
Hodson Elementary
Crossland Construction
Rev Est $1.1M Cost Act $780K Profit Rem $245K
Mission Addition
Nabholz
Rev Est $890K Cost Act $640K Profit Rem $185K
Owasso Fire Station 4
Timberlake Construction
Rev Est $720K Cost Act $510K Profit Rem $140K
Bixby Library Expansion
Wallace Engineering
Rev Est $540K Cost Act $415K Profit Rem $95K
Jenks Aquatic Center
Flintco
Rev Est $465K Cost Act $380K Profit Rem $80K
Sand Springs Mech Reno
Builders Unlimited
Rev Est $310K Cost Act $355K Profit Rem -$48K

Cards replace the 7-column WIP table. Each card: project name (semibold 14px) + GC (12px secondary) on the left, a 3-row stacked mini-table on the right with monospace dollar values for column alignment. Profit Rem is bolded and color-coded — green when positive, red when underwater (with the row tinted rose to call attention). Sorted Profit Rem $ desc; one negative job at the bottom of the visible 8.